Thread Content
This post was last edited by Hasty Passerby on 2018-12-10 at 09:29. Essential mnemonics for the First-Class Constructor Examination! I. Memorize the tower crane operation rules’ “Ten Things Not to Lift” through a mnemonic: Check for uneven people and excessive load; ensure the equipment is level and securely fastened. (1) Do not lift heavy objects when pulling them at an angle ; (II) Do not lift when there are people or floating objects on the load ; (III) Do not lift when the work area is dim and it is not possible to see the area clearly, as well as the lifted objects and command signals ; (IV) Do not lift if the load is overloaded or the weight of the object to be lifted is unknown ; (5) Do not lift if the command signals are unclear ; (VI) Do not lift when the items inside the container are overfilled ; (7) If it is not securely bundled or hung, or if the balance is poor, it may cause it to slide instead of remaining suspended ; (8) Do not lift when there is no padding between the sharp edges of the lifted object and the binding steel ropes ; (IX) Do not lift when the structure or components have defects or damages that affect safe operation ; (10) Do not lift buried objects when the pulling force is unclear. II. Memorize the “Ten Don’ts” rules for gas cutting and electric welding through a mnemonic: Inside, steal names of tools; outside, handle things properly. (1) Welding or cutting shall not be carried out if the welder is unaware of whether there are flammable or explosive substances inside the workpiece ; (II) Welding or cutting is prohibited in areas equipped with insulating layers, cooling layers, soundproofing, or heat-insulating devices made of flammable materials, or in places where sparks may fly, until effective and reliable safety measures have been taken ; (III) Welding or cutting is not allowed on pressurized or sealed pipes and containers ; (IV) Welding and cutting are prohibited when there are nearby operations that conflict with open-flame work ; (5) Welding or cutting shall not be carried out on various containers that have held flammable gases, flammable liquids, and toxic substances until they have been thoroughly cleaned or the hazards have been eliminated ; (6) At the sections connected to external units, welding or cutting is not permitted until it is confirmed that there is no danger, or unless effective measures are taken despite knowing of the existing risk ; (7) Welders must not carry out welding or cutting operations if they are not aware of the conditions surrounding the welding or cutting site ; (8) Welders must work with a valid certificate; those without one are not allowed to perform welding or cutting tasks ; (9) Welding and cutting operations that fall under the categories of level 1, 2, or 3 for hot work are not permitted to be carried out without going through the necessary approval procedures for hot work ; (10) If there are flammable and explosive materials in the vicinity of the welding or cutting area, welding or cutting is not permitted until those materials have been removed or effective safety measures have been taken. III. Memorize the methods of safety inspections through a mnemonic: On designated days and seasons, conduct inspections and re-establish procedures as required. (1) Professional inspections, special inspections ; (II) Routine inspections ; (III) Seasonal inspections ; (IV) Safety inspections before and after the festival ; (5) Regular safety inspections ; (VI) Safety inspections before and during resumption of work ; ( VII ) Safety inspection of equipment and facilities ; (8) Regular inspections. IV. Mnemonic for construction project costs: Not available yet. (1) Provisional costs: During the night work in the second ring road, the scaffolding is firmly in place. 1. Two: Secondary handling ; 2. Circle: Environmental protection ; 3. Night: Construction at night ; 4. Temporary: Ad hoc measures ; 5. Large: Large-scale machinery ; 6. Water: Precipitation, drainage ; 7. Formwork: Cost for formwork installation and templates ; 8. Scaffold: Erection scaffold ; 9. Completed: Cost for the protection of completed projects and equipment ; 10. Safety: Safe construction ; 11. Stability (Civility): Civilized construction. (II) Fees: Baoding is pollution-free. 1. Protection: Social security ; 2. Determination: Establishment of engineering quota standards ; 3. None (no pollution): No wastewater discharge from the project ; 4. Male: Housing provident fund ; 5. Harm: Insurance against dangerous accidents and injuries. V. Mnemonic for the contents of the construction organization design: No funds or plans are allowed without approval. (1) Overview: General information on the project ; (II) No: Construction plan ; (III) Approval: Construction preparation plan ; (IV) Progress: Construction schedule ; (V) Capital: Resource requirement plan ; (VI) Refers to: main technical and economic indicators ; (7) Diagram: Plan layout of the construction site. VI. Mnemonic for the contents of the project management plan: In communication, be cautious; avoid chaos like a mad sow; dogs are stupid, so stay as quiet as possible. (1) Overview: Project summary ; (II) Scope Management Plan: Planning for the scope of the project ; (III) Communication: Project communication management plan ; (IV) Information: Project information management plan ; (V) Receipt: Project closure management plan ; (VI) Madness (Wind): Project risk management plan ; (7) Mother (Goal): Project management objective planning ; (8) Pigs (group): Project management organization planning ; (IX) Dogs (Purchase, Funding): Project procurement and resource management planning ; (X) Ben (Ben): Project cost management plan ; (11) Progress: Project progress management plan ; (12) Quantity: Project quality management plan ; (13) Quietness (Peace, Environment): The project’s occupational health, safety, and environmental planning. VII. Mnemonic for the contents of the construction project management implementation plan: The operator of the flat-coverage machine makes a mistake regarding communications; entering this crazy garden only brings silence. (1) Plan: Site layout plan of the project ; (II) Overview: General information on the project ; (III) Machinery (Technology): Technical solution ; (IV) Leader (Group): Organizational plan ; (V) Errors (Mistakes): Project objective control measures ; (VI) Refers to: technical and economic indicators ; (7) Communication: Project communication plan ; (8) Information: Information management plan ; (IX) Attack (Work): Overall work plan ; (10) Progress: Schedule ; (11) Base: Cost plan ; (12) Mad Garden (Wind, Source): Project risk management plan, resource management plan ; (13) Quality: Quality plan ; (14) Closure: Finalization management plan ; (15) Quietness (Peace, Environment): Occupational health, safety, and environmental management plan. VIII. Key points of the special construction plan for earthwork excavation – mnemonic: Put a chicken in the broken vehicle, measure it in water; it sinks according to time and sequence. (1) Location of the ramp ; (II) Vehicles entering and leaving the road ; (III) Slope requirements ; (IV) Design of support structure ; (5) Machine selection ; (VI) Precipitation control measures ; ( VII ) Monitoring requirements ; (8) Excavation time ; (IX) Excavation sequence ; (10) Layered excavation depth. IX. Basis for preparing the quality plan for construction projects – mnemonic: Legitimate documents and specialized design. (1) Design drawings and related documents ; (II) Quality management procedure documents and their requirements for enterprises and project management departments ; (III) Project contracting contract ; (IV) **Local laws, regulations, technical standards and specifications, as well as relevant construction procedures ; (5) Construction organization design, special construction plans, and project schedule. X. Basis for formulating the overall construction schedule: Mnemonic phrase: For joint venture projects, guidelines and techniques must be established. (1) Project contract and tender documents ; (II) Resources required for the project, including labor availability, capacity of machinery and equipment, and material supply conditions, etc ; (III) All design and construction drawings for the project, as well as any changes and adjustments ; (IV) The main construction plans and measures to be adopted for the project, the construction sequence, the division of work stages, etc ; (5) Requirements for construction set by local construction administration authorities ; (VI) Natural and technical-economic conditions of the location where the project is situated ; (7) Information on the estimates (budgets), indicators, labor quotas, machinery shift quotas, and schedule quotas related to the engineering project ; (8) Current technical regulations such as standards, procedures, and technical-economic indicators. XI. Basis for preparing the progress plan for individual construction projects – mnemonic: Aggregate, allocate, quantify; time it, then draw up an optimal plan. (1) Collection of basis for compilation ; (II) Divide the construction process, construction sections, and construction floors ; (III) Determine the construction sequence ; (IV) Calculate the engineering quantity ; (5) Calculating the required amount of labor or machine man-hours ; (VI) Determine the duration ; (7) Draw a feasible construction schedule chart ; (8) Optimize and draw the construction progress evolution chart. XII. The mechanized excavation of earthwork is guided by the mnemonic: Determine the scale of the foundation; consider the quality, depth, and water transportation requirements. Volume of earthwork, foundation type, project scale, geology, site and equipment conditions, excavation depth, groundwater conditions, transportation distance, schedule requirements, characteristics of earthmoving machinery. XIII. Others (I) On-site quality inspection methods: 1. Visual inspection method: “look, touch, tap, shine”; 2. Practical measurement method: “lean against, measure, lift, fit”; 3. Testing methods: physical and chemical tests, non-destructive testing. (II) Safety inspection methods for construction projects: “Listen, ask, observe, measure, test, and conduct operation tests.” (III) Points related to digital aspects: One policy: Safety first, prevention foremost, comprehensive management. Category 2 hazard sources: accidental release of energy, failure of constraints. Third-level education: entering a company (factory), entering a project department (workshop), and entering a work team. Grade 3 accidents: fatal accidents, major accidents (3–9 casualties), and extremely serious accidents. The three simultaneities principle: design simultaneously, construct simultaneously, and put into use simultaneously. The three essentials: safety helmet, safety belt, and safety net. Three-level power distribution: main power distribution box, distribution box, and switch box. Four areas: stairways, elevator entrances, reserved openings, and passageways. Four principles to be adhered to: do not move on until the cause of an accident is identified; do not move on until those responsible have received training; do not move on until potential hazards are eliminated; do not move on until those responsible have taken action. Ten edges to be protected: the perimeter of foundation pits, the perimeter of balconies that still lack railings or guardrails, the perimeter of floors and roofs without external scaffolding for protection, the sides of scaffolding structures used in multi-level construction along staircases and stair sections, both sides of passages leading to buildings such as construction elevators or external scaffolding, the perimeter of floors in frame structure buildings, both sides of ramps, the perimeter of material platforms and cantilevered platforms, the edges of canopies and overhangs, and the perimeter of water tanks and water towers (perimeter of balconies, perimeter of roofs, perimeter of frame structures, outer side of unloading areas, runways, and ramp edges). Five inspections: inspect thoughts, management, potential hazards, rectification efforts, and accident handling. Five determinations: determine the person responsible for the rectification, the measures to be taken for rectification, the deadline for completing the rectification, the person who will complete the rectification, and the person who will conduct the acceptance check. Five types of inspections: routine inspections, professional inspections, seasonal inspections, inspections before and after holidays, and irregular inspections. Five signs: instructions, prohibitions, warnings, reminders; five boards and one diagram for electrical safety: the project overview board, the board listing management personnel and their contact numbers, the fire protection and security board, the work safety board, the board on civilized construction and environmental protection, and the general layout plan of the construction site. Six stages: Measure stage, Information dissemination stage, Education stage, Protection stage, Inspection stage, Improvement stage. Six to be eliminated: injury and death accidents, collapse accidents, object strike accidents, falls from heights accidents, mechanical injury accidents, and electric shock accidents.