Mechanical pressurized air supply outlets should be installed in the stairwells every ( ) floors, while pressurized air supply outlets in the anterooms should be installed every ( ) floors. Answer: Mechanical pressurized air supply outlets should be installed in the stairwells every (2-3) floors, while pressurized air supply outlets in the anterooms should be installed every (1) floor.
Reply #22018-12-16
Answer: Mechanical pressurized air supply outlets should be installed in the stairwells every (2-3) floors, while pressurized air supply outlets in the anterooms should be installed every (1) floor.
Reply #32018-12-16
A pressurized supply air outlet should be provided in the stairwell every two to three floors; a pressurized supply air outlet should be installed on each floor in the antechamber.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.