HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

【Daily Question】Utilities - Water Supply and Drainage - 20190116

2019-01-16View Original

Thread Content

When calculating the pipe network, not all pipelines are included; only the simplified main pipe network is calculated. A pipe network diagram consists of many pipe segments, and () refers to the flow rate required to supply the users on both sides of that pipe segment. a. Pipeline leakage rate b. Node flow c. Flow along the pipeline d. Flow along the pipeline and node flow Answer: c
Reply #22019-01-16
d. Flow along the route and node flow

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.