HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

【Daily Question】Utilities - Civil Engineering - 20190403

2019-04-03View Original

Thread Content

The following items in ( ) require the simultaneous participation of the owner’s project team, the supervision team, and the construction team. A. Collect technical standards, prepare a list of such standards, and carry out configuration and labeling. B. Joint review of construction drawings and design briefing meetings. C. Preparation and approval of general construction technical plans. D. Preparation and approval of major (special) construction technical plans (measures). Answer: BD
Reply #22019-04-03
D. Preparation, approval of major (special) construction technical plans (measures)

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.