HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

【Daily Question】Utilities - HVAC - 20190921

2019-09-22View Original

Thread Content

This post was last edited by hesonchang214 on 2019-9-26 22:09. Pipes equipped with compensators should have ( ) installed, and their structural design and placement must comply with the design requirements. A. Sliding support B. Guiding support C. Fixed support D. Spring support Answer: C
Reply #22019-09-22
Pipelines equipped with compensators shall be provided with (c), and their structural form and location shall meet the design requirements. A. Sliding support B. Guiding support C. Fixed support D. Spring support

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.