HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

[Utilities – Water Supply and Drainage Section] 20181214

2018-12-14View Original

Thread Content

When a water tower is installed at the end of the pipeline network, in which of the following water consumption scenarios must both the secondary pumping station and the water tower supply water to the pipeline network? ( ) a、Maximum daily water consumption b、Average daily water consumption c、Maximum water consumption at the peak time of a day d、Average water consumption at the peak time of a day Answer: c. In the piping network equipped with opposing water towers, it must be supplied jointly by the secondary pumping station and the water towers during peak water usage. As for the other options, the speed and flow rate may vary depending on the different grading designs of the pump stations.
Reply #22018-12-15
c、Maximum daily peak water consumption
Reply #32018-12-15
c、Maximum daily peak water consumption
Reply #42018-12-15
c、Maximum daily peak water consumption
Reply #52018-12-15
c、Maximum daily peak water consumption

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.