【Daily Question】Utilities - Mechanical & Electrical - 20190923

2019-09-23View Original

Thread Content

According to the \"Code for Construction and Acceptance of Continuous Conveying Equipment Installation Projects\", continuous conveying equipment must pass trial operation before it can be put into production use. The supervision engineer is to assist ( ), and organize the project acceptance and handle the handover procedures after successful trial operation.    A. The construction unit organizes a load-tested commissioning B. The construction unit organizes a no-load commissioning C. The contracting unit organizes a load-tested commissioning D. The contracting unit organizes a no-load commissioning Answer: A
Reply #22019-09-23
A. The construction unit organizes a trial operation under load
Reply #32019-09-23
A. The construction unit organizes a trial operation under load

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.