Thread Content
This post was last edited by Desert Fish on 2024-7-3 at 11:50. Safety first. Prevention first – let’s give praise and support to the achievements made in China’s chemical engineering technology and equipment. **********************【Ten Years of Great Development in Chemical Engineering Equipment】A continuously updated summary post is available; feel free to join the discussions at https://bbs.hcbbs.com/thread-3576046-1-1.html (Source: Haichuan Chemical Engineering Forum) ***************** At 18:36 on June 30, 2024, the quench water tower for the 1.2 million tons per year ethylene cracking unit in China National Petroleum Corporation’s Guangxi Petrochemical Company’s integrated refining and chemical production project was successfully installed, marking the completion of this phase of the project. As a key core equipment for the 1.2 million tons per year ethylene cracking unit in China National Petroleum Guangxi Petrochemical Company’s refining and chemical integration transformation project, the successful installation of this tower marks the full commencement of the installation work for the project’s steel structure and large-scale equipment. This tower is one of the three large-scale, oversized tower structures in the ethylene plant; it has a height of 63.15 meters and a total lifting weight of 1680 tons. It was constructed, transported, and lifted as a single unit, with a 4000-ton crawler crane being used for the main lifting operation and a 1600-ton crawler crane assisting with the process.
Installing large-scale equipment is a technical task, and it is gratifying to see the significant improvement in the installation skills in our country.
The lifting of large equipment indicates that the installation of a large number of devices is about to begin.
A maniac when it comes to infrastructure construction and equipment installation!