This post was last edited by hesonchang214 on 2019-11-14 at 14:52. For a multi-functional service building with a total height of 126 m, where the water demand inside the building is quite uneven, it is necessary to maintain stable water pressure and ensure high reliability in water supply; therefore, the (    ) water supply method should be adopted.       A: Zoned parallel water supply system with pumps and water tanks  B: Water supply system with a separate water tank  C: Zoned series water supply system with pumps and water tanks  D: Direct water supply system using variable-frequency pump units Answer: C is the correct answer
Reply #22019-11-12
A: Zoned parallel water supply system with water pumps and water tanks

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.