HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

What should be noted when starting the EDI system in electroplating ultra-pure water equipment

2019-12-05View Original

Thread Content

  Once the EDI system is up and running, (in fact, the EDI system will inevitably experience some level of shutdowns and restarts. ) Each shutdown and restart implies changes in pressure and flow, as well as mechanical stress on the EDI module. Therefore, the number of system shutdowns and restarts should be kept as low as possible to ensure the smooth operation of the EDI system.   Inspections before and during system startup should be carried out as part of regular daily work, with proper records kept. The calibration of instruments, alarm checks, as well as inspections for leaks in safety equipment and pipelines should also be carried out as part of regular daily tasks.   Constantly monitoring the operation of the industrial pure water system, and identifying as well as promptly resolving EDI-related faults, ensures long-term stability in the equipment’s performance and effectively extends its service life.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.