HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

【Daily Question】Hydropower Engineering - 20200426

2020-04-26View Original

Thread Content

Multiple choice: It is necessary to make ( ) safe flood control a key focus of flood prevention and control efforts, strengthen the management of safe operation during the main flood season, strictly follow the approved scheduling plans, arrange for pre-drainage in advance, ensure sufficient flood storage capacity, and strictly prohibit operating beyond the designated flood level limits. A. Reservoir B. Hydropower station C. Lake D. Check dam Answer: ABD

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.