HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

【Daily Discussion】Utilities - Water Supply and Drainage - 20200719

2020-07-19View Original

Thread Content

Under what conditions are the quotas for domestic water consumption in residential areas established? Feel free to participate actively in the discussions – there are wealth rewards for everyone! ! !
Reply #22020-07-20
The water consumption for domestic use by urban residents is determined based on factors such as the city’s population, the average daily water usage per person, and the coverage rate of water supply in the city
Reply #32020-07-20
Factors such as urban population, average daily water consumption per person, and the extent of water supply coverage in cities
Reply #42020-07-20
Factors such as urban population, average daily water consumption per person, and the extent of water supply coverage in cities
Reply #52020-07-20
Urban population, average daily water consumption per person, and urban water supply coverage rate.
Reply #62020-07-20
Factors such as urban population, average daily water consumption per person, and the extent of water supply coverage in cities
Reply #72020-07-20
Factors such as urban population, average daily water consumption per person, and the extent of water supply coverage in cities
Reply #82020-07-20
Urban population, average daily water consumption per person, and urban water supply coverage rate.
Reply #92020-07-21
The water quota refers to the level of water consumption to be achieved during the design period; therefore, it is necessary to conduct short- and long-term water volume forecasts by analyzing factors such as urban planning, the production activities of industrial enterprises, residents’ living conditions, and climate conditions, in conjunction with existing data on water consumption. The quotas for domestic water use and comprehensive water use by residents should be determined through a comprehensive analysis, based on the local national economic and social development plans as well as the availability of water resources, taking into account the existing water use quotas along with the planning for water supply systems and the conditions for the development of water supply infrastructure.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.