This post was last edited by Wise Ming on 2021-12-5 21:03 During the construction of the pipe gallery of the construction project, the installation unit carefully carried out safety and quality management improvement actions. The on-site environment was clean, scaffolding was erected throughout the hall, and the roads were hardened, ensuring the quality, safety and effectiveness of the project.
The pump equipment installed under the pipe gallery is protected.
It is clean and tidy, and well protected. However, the corresponding scaffolding costs are not small, and both Party A and Party B must take this into consideration.
Clean and tidy, well protected!
Do it well, this is people-oriented
On the surface, the cost of the measures has increased, but on the other hand, the safety factor of the working surface and construction has increased. The upper and lower parts are constructed at the same time, the work efficiency is improved, the construction period is shortened, and the cost is saved.
The work is completed, the materials are clean, and the site is cleared. It’s a few simple words, but how many projects can really be put into place. The poster did a very good job in civilized construction of this project.
This kind of project looks comfortable.
Yes, a clean construction environment will greatly improve the quality assurance of process pipeline system purging and pressure testing in the future.
There is a high probability that only PetroChina and Sinopec can sacrifice capital like this.