Lifting of large-scale equipment for the urea production unit in the second phase of Jingyuan Chemical Project

2025-08-15View Original

Thread Content

Recently, the Second Lifting Command Center of Daji Company delivered another success story at the site of the second phase of the Baiyin Jingyuan Chemical project: the lifting of two large, critical equipment units for the urea production facility was completed successfully. With \"Daji speed,\" they demonstrated their determination to overcome challenges, and through \"precise operations,\" they showed their sense of responsibility, thus accelerating the progress of the project construction. With precise command signals, the 800-ton crawler crane exerted steady force by lifting its main arm to a height of 87 meters, while the 400-ton truck crane assisted in guiding the load. The urea synthesis tower, weighing 202 tons and with dimensions of Φ3020*18773 mm, was successfully lifted after being accurately positioned and placed in place. Subsequently, the team seized the opportunity and immediately devoted themselves to the lifting operation of the stripping tower. Faced with this equipment with specifications of Φ2396*13171 mm and a weight of 103 tons, the lifting team maintained its efficient and coordinated approach, ensuring seamless coordination among all tasks and precise operations, thus once again completing the mission successfully. Successfully lifting two large-scale equipment in a single day not only demonstrated the robust capabilities of these heavy machinery devices but also showcased the team’s spirit of being willing to take on tough challenges and achieving success in such situations. The efficient completion of this lifting task is a vivid example of the Second Lifting Command Post’s thorough implementation of the group company’s “135” development strategy and its full adherence to the company’s “123” work plan. The team has always relied on the \"five systems\" and \"five standardizations\" for management. From thoroughly analyzing the lifting conditions and optimizing the construction plans in the early stages, to strictly implementing safety and technical instructions as well as standard operating procedures on site, every detail reflects the strategic wisdom of seeking efficiency through effective management and breakthroughs through collaboration, thereby ensuring that lifting operations are carried out safely, efficiently, and accurately. As a key milestone in the second phase of the Jingyuan Chemical project, the successful lifting of the large-scale equipment for the urea production unit has laid a solid foundation for subsequent tasks such as the installation of process pipelines and equipment commissioning. Next, the Second Lifting Command Center will continue to focus on the goals of project construction, with greater enthusiasm and a more pragmatic approach, taking the lead in major engineering projects and contributing to the company’s efforts to achieve excellence through concrete actions.
Reply #22025-08-15
【Ten Years of Rapid Development in Chemical Processing Equipment】The total weight of the 25-8 project in Huizhou, spanning the period from 2615 to 2025, is approximately 14,370 tons; the DPPB module was shipped from Qingdao, Shandong. https://bbs.hcbbs.com/thread-5698754-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #32025-08-16
【Ten Years of Rapid Development in Chemical Processing Equipment】From 2016 to 2025, Tianhua Institute independently developed 8 heat box systems, which were successfully deployed in ExxonMobil’s 500,000 tons per year low-density polyethylene (LDPE) production facility. https://bbs.hcbbs.com/thread-5698775-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #42025-08-16
【Ten Years of Rapid Development in Chemical Processing Equipment】From 2016 to 2025, Tianhua Institute independently developed 8 heat box systems, which were successfully deployed in ExxonMobil’s 500,000 tons per year low-density polyethylene (LDPE) production facility. https://bbs.hcbbs.com/thread-5698775-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #52025-08-16
【Ten Years of Rapid Development in Chemical Equipment】From 2017 to 2025: Overcoming key technical challenges; China’s first thousand-ton-class high-performance carbon fiber production line was built in Datong, Shanxi https://bbs.hcbbs.com/thread-5698780-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #62025-08-16
【Ten Years of Rapid Development in Chemical Processing Equipment】From 2020 to 2025, Zhongkong Technology, in partnership with Zhejiang Petrochemical, built the largest integrated refining and chemical processing project to date, setting a control point count of 770,000. https://bbs.hcbbs.com/thread-5698836-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #72025-08-17
【Ten Years of Rapid Development in Chemical Equipment】2621-2025: Yushan Island Petrochemical Project in Zhejiang – the world’s largest hot-water flash evaporation desalination facility https://bbs.hcbbs.com/thread-5698838-1-1.html (Source: Haichuan Chemical Forum)
Reply #82025-08-17
【History of Haichuan Chemical】50 Years Since the Establishment of Zhenhai Refining & Chemical, Sinopec’s Largest Refinery https://bbs.hcbbs.com/thread-5698859-1-1.html (Source: Haichuan Chemical Forum)

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.