The first start-up of the steam-driven pump and turbine for the heat recovery high-pressure boiler feed water pump in Jiangxi Xinlianxin’s industrial chain extension project was successful

2025-08-20View Original

Thread Content

On August 9, the prime start-up of the steam-driven pump and turbine for the heat recovery high-pressure boiler feed pump in Jiangxi Xinlianxin’s industrial chain extension project was successful. The process began at 17:06 on August 8 with the heating of the pipes; it involved conducting tests for the tightness of the high-pressure valves, as well as electrical and mechanical overload shutdown tests. By 01:50 on August 9, after joint verification by the owner’s production team, Zhongda Supervision, and the equipment manufacturer, it was confirmed that the first start-up of the steam-driven pump turbine had been successfully completed. The successful commissioning this time marks the unit’s official readiness for operation, representing a crucial transition from the construction phase to the operational phase, and laying a solid foundation for the project’s subsequent full-scale operation. Jiangxi Xinlianxin Chemical Industry Co., Ltd. Industrial Chain Extension Project. Project type: Renovation and expansion; Project code: 2201-360430-04-01-323153; Constructor: Jiangxi Xinlianxin Chemical Industry Co., Ltd.; Location of construction: Xinlianxin Company has a large-scale project site and a compound fertilizer production site, and this project is located within the reserved land for the DMF production facility at the existing large-scale project site; Staffing and operation regulations: The project will require an additional 536 employees, with an annual operating time of 7,200 hours; Total investment for the project: 1,000,000 million yuan, of which 600 million yuan is allocated to environmental protection measures, accounting for 0.6% of the total investment. Project construction period: 18 months; Construction scale: The main components of the project include a set of gasification and purification units for 600,000 tons of synthetic ammonia, a set of dimethylformamide (DMF) production units along with 100,000 tons of mixed methylamine production capacity, a set of melamine production units along with 480,000 tons of ammonium carbonate production capacity and corresponding urea melting units, a set of N-methylpyrrolidone (NMP) production units along with GBL production units, as well as the construction of utility boilers and air separation units. Upon completion, the project will have an annual production capacity of 600,000 tons of synthetic ammonia, 100,000 tons of DMF, 100,000 tons of mixed methylamine, and 80,000 tons of melamine; in addition, it will be able to produce 480,000 tons of ammonium carbonate and 100,000 tons of NMP.
Reply #22025-08-20
【Ten Years of Rapid Development in Chemical Equipment】2628-2025: Purity over 99.99997%! Major breakthrough achieved in natural gas helium extraction technology in our country! https://bbs.hcbbs.com/thread-5699125-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #32025-08-21
【Ten Years of Rapid Development in Chemical Engineering Equipment】2629-2025: China’s First Intelligent Painting Line for Offshore Oil and Gas Equipment Put into Use https://bbs.hcbbs.com/thread-5699156-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #42025-08-21
【Ten Years of Rapid Development in Chemical Engineering Equipment】2629-2025: China’s First Intelligent Painting Line for Offshore Oil and Gas Equipment Put into Use https://bbs.hcbbs.com/thread-5699156-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #52025-08-22
【Ten Years of Rapid Development in Chemical Processing Equipment】The core equipment for the world’s first 1,000-ton pilot plant for green hydrogen-based aviation fuel was successfully installed between 2030 and 2025. https://bbs.hcbbs.com/thread-5699223-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #62025-08-23
【Ten Years of Rapid Development in Chemical Engineering Equipment】The first offshore pressure station equipped with a weather radar in China was installed at the 800-megawatt offshore wind project in Dafeng, Jiangsu, from 2632 to 2025. https://bbs.hcbbs.com/thread-5699296-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #72025-08-25
【The Defunct Fertilizer Plant】Jiangxi’s Second Fertilizer Plant, which used the coke oven gas and blast furnace gas produced by Xinyu Iron and Steel Plant as raw materials https://bbs.hcbbs.com/thread-5699412-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #82025-08-26
【Ten Years of Rapid Development in Chemical Equipment】2633-2025: Jilin Petrochemical’s world’s first million-ton-scale diesel adsorption separation unit was successfully commissioned on its first attempt https://bbs.hcbbs.com/thread-5699500-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #92025-08-29
【Ten Years of Rapid Development in Chemical Equipment】2639-2025: SHENGU’s world’s largest single-green ammonia project features China’s first domestically produced set of green ammonia centrifugal compressors https://bbs.hcbbs.com/thread-5699944-1-1.html (Source: Haichuan Chemical Forum)
Reply #102025-08-30
【Ten Years of Rapid Development in Chemical Processing Equipment】2641-2025: Guangxi Refining & Chemicals’ 2 million tons per year diesel adsorption separation unit was successfully commissioned for the first time https://bbs.hcbbs.com/thread-5700113-1-1.html (Source: Haichuan Chemical Industry Forum)

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.