HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Key equipment for the PUSRI ⅢB project in Palembang, Indonesia, has been officially dispatched from Sichuan

2025-08-27View Original

Thread Content

At 5 a.m. on August 20, the key equipment for the PUSRI ⅢB project in Palembang, Indonesia, which was constructed under the EPC contract by Sinochem, set off from Sichuan. The equipment will be transported by land to Leshan Port, where it will be loaded onto a barge and then shipped by river to Shanghai Port, from where it will be transported to the project site in Indonesia using a heavy lift ship.   The maximum manufacturing cycle for this equipment’s largest component is 8 months; its length is 55 meters, with a width and height of 6.5 meters, and its weight is approximately 300 tons.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.