HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Baking of the coking plant at the Pingxiang Xuyang project site has begun

2025-10-21View Original

Thread Content

On October 17, at the Pingxiang Xuyang Coking Project site, nearly 2,600 construction workers were working hard in various work areas, creating a highly active and bustling atmosphere.
Reply #22025-10-22
【HaiChuan Overseas Engineering】Installation of the first large crude oil storage tank floating unit with a capacity of 80,000 cubic meters for the Lobito refinery project in Angola completed https://bbs.hcbbs.com/thread-5703456-1-1.html (Source: HaiChuan Chemical Forum)
Reply #32025-10-22
【Ten Years of Rapid Development in Chemical Engineering Equipment】The 2751-2025 Three Gorges Group large-scale compressed air energy storage system and key equipment development and application demonstration project has successfully started generating electricity. https://bbs.hcbbs.com/thread-5703150-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #42025-10-22
【Ten Years of Rapid Development in Chemical Engineering Equipment】The 3000HP five-cylinder pump intelligent operation and maintenance system, independently developed by Lansi Equipment Company, was completed and tested between 2025 and 2752. https://bbs.hcbbs.com/thread-5703151-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #52025-10-23
【Ten Years of Great Development in Chemical Engineering Equipment】Sinopec’s independently developed intelligent assistance system for evaluating defects in pipeline circumferential weld X-ray inspections, 2754-2025, has completed accuracy tests. https://bbs.hcbbs.com/thread-5703159-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #62025-10-23
【Ten Years of Rapid Development in Chemical Engineering Equipment】The intelligent pipeline inspection model for petroleum pipelines in China, developed between 2025 and 2755, has been successfully created and put into use. https://bbs.hcbbs.com/thread-5703160-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #72025-10-23
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2756 to 2025: The petroleum university team made significant breakthroughs in oil and gas pipeline technology using sound-magnetic integrated ultra-high-definition detection technology. https://bbs.hcbbs.com/thread-5703161-1-1.html (Source: Haichuan Chemical Engineering Forum)
Reply #82025-10-23
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2017 to 2024, CNPC Pipeline Bureau made breakthroughs in key technologies for flexible welding robots in mountainous areas! https://bbs.hcbbs.com/thread-5703164-1-1.html (Source: Haichuan Chemical Industry Forum)

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.