Should the secondary grouting of equipment be handled by the equipment specialty team or the civil engineering team?

2018-09-24View Original

Thread Content

Should the secondary grouting of equipment be handled by the equipment specialty team or the civil engineering team? Secondary grouting is involved in equipment installation, but there is a dispute between the civil engineering and equipment teams. The civil engineering team believes that since this is part of the equipment installation process, it should be the responsibility of the equipment team, while the equipment team thinks it is a task belonging to the civil engineering team and therefore not within their scope of responsibility. Please ask the expert to explain who is actually responsible and how the settlement will be handled Thank you!
Reply #22018-09-24
Secondary grouting should be the responsibility of the civil engineering department.
Reply #32018-09-24
It’s definitely the civil engineering department that’s in charge of this. Formwork needs to be set up, and it’s necessary to know what grade of concrete to use and what its strength should be. Does the equipment management department understand this? However, before performing the secondary grouting, the equipment must be in place and properly positioned first, before it is handed over to the civil engineering team for the secondary grouting.
Reply #42018-09-24
Civil engineering should be handled clearly, or better yet, managed by professionals in the civil engineering field.
Reply #52018-09-24
Hehe, this topic should be handled by the civil engineering team for the secondary grouting. However, it is best for those in charge of the installation to provide guidance during the process; this is especially true for large, precision mechanical equipment, which should be installed under the supervision of qualified personnel. As for the settlement, it should be related to the civil engineering aspect. Regarding the materials used for grouting, prepared special grouting compounds are now commonly used, and they solidify almost within 24 hours. It does not affect connection and installation with other devices.
Reply #62018-09-24
Civil engineering and equipment work need to coordinate with each other. It doesn’t matter whose responsibility it is; what’s important is to take responsibility for it. Generally, the civil engineering team is in charge, and once the equipment has been aligned, they notify the civil engineering team to carry out the secondary grouting
Reply #72018-09-24
The completion of a project relies on close cooperation among various specialties. The secondary grouting of equipment shall be carried out by the civil engineering team, with the support of the equipment and process teams.
Reply #82018-09-24
The civil engineering department is in charge, while the equipment department oversees it.
Reply #92018-09-24
Secondary grouting should be the responsibility of the civil engineering team
Reply #102018-09-24
After the equipment team completes the secondary leveling work to satisfactory standards, it notifies the civil engineering team to carry out grouting; the civil engineering team handles the actual operations, while the equipment team is responsible for monitoring and testing. Nowadays, grouting materials are widely used, as they gain strength quickly, which helps to reduce waiting times and accelerate the construction process. Settlement is even less of an issue; as long as Party A specifies which department is responsible (through a work order), that department can handle the settlement.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.