The main structure of Building 11 in the China Chemical Pilot Plant Project has been fully completed

2025-11-04View Original

Thread Content

The main structure of Building 11 in the China Chemical Pilot Plant Project has been fully completed. The completion of the main structure of Building 11, which was constructed by the Seventh Engineering Company of Shisi Hua Jian, marks a milestone achievement in the construction of this project. Since the mid-August when the construction of the main structure for the pilot plant project officially began, the project team provided proactive support to the construction teams. Through measures such as grid-based management in terms of technology, safety, quality, and cost control, it was possible to complete the construction of the main structures for all 11 individual buildings efficiently and to a high standard, achieving an impressive construction speed. Going forward, the project department will pursue the annual goals with even greater enthusiasm to contribute to the company’s high-quality development.
Reply #22025-11-04
【Ten Years of Rapid Development in Chemical Engineering Equipment】2795-2025: Filling a Gap in China’s Market – Boyun Bio’s High-Performance Chromatography Consumables Facility Now Operational in Tianjin https://bbs.hcbbs.com/thread-5704377-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #32025-11-05
【Ten Years of Rapid Development in Chemical Engineering Equipment】2796-2025: Construction Management of Ethylene Process Piping Projects at Huanqiu Liu Jian’s Tarim Project Site – Completion of All Tasks https://bbs.hcbbs.com/thread-5704422-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #42025-11-05
【Ten Years of Rapid Development in Chemical Equipment】2797-2025: Guangxi Petrochemical’s world’s first variable-frequency drive system enables hot standby switching for compressors in electrically driven ethylene production units. https://bbs.hcbbs.com/thread-5704443-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #52025-11-05
【Ten Years of Rapid Development in Chemical Equipment】2797-2025: Guangxi Petrochemical’s world’s first variable-frequency drive system enables hot standby switching for compressors in electrically driven ethylene production units. https://bbs.hcbbs.com/thread-5704443-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #62025-11-05
【HaiChuan Discussion】The client’s demands are getting higher and higher, while the prices kept being pushed lower. Can something made under such conditions pass the acceptance test? https://bbs.hcbbs.com/thread-5704576-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #72025-11-06
【Ten Years of Rapid Development in Chemical Equipment】The first commercial ammonia-to-hydrogen production facility in China with a capacity of 1,000 kilograms was officially commissioned in Foshan between 2027 and 2025 – the Fuda Zijin facility. https://bbs.hcbbs.com/thread-5704478-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #82025-11-06
【Ten Years of Rapid Development in Chemical Equipment】The core equipment for China’s first 400,000 tons/year LAO production facility – the high-purity C4 and C6 product towers – was accepted in Dalian. https://bbs.hcbbs.com/thread-5704530-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #92025-11-06
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2800 to 2025: Kunming University of Science and Technology, in collaboration with Guangdong, developed China’s first mobile zero-carbon hydrogen production and power generation unit, which was unveiled at the forum. https://bbs.hcbbs.com/thread-5704545-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #102025-11-07
【Ten Years of Rapid Development in Chemical Engineering Equipment】The first 6MPa 3,500-ton gasification furnace developed as part of the Space Long March project was successfully ignited during the pilot operation of the integrated project for clean and efficient utilization of resources in Xinjiang’s Zhongneng Lvyuan area. https://bbs.hcbbs.com/thread-5704592-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #112025-11-07
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s first carbon dioxide + flywheel energy storage demonstration project was completed in Deyang, Sichuan, from 2003 to 2022. https://bbs.hcbbs.com/thread-5704593-1-1.html (Source: Haichuan Chemical Industry Forum)

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.