HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

[Haichuan Overseas Engineering] Successful lifting of giant FRP fiberglass storage tanks for chlor-alkali project in Jujuy, Argentina

2025-11-12View Original

Thread Content

Successful installation of giant tank at Argentina’s Jujuy chlor-alkali project Recently, a giant FRP fiberglass tank was successfully installed at the site of the Argentina’s Jujuy chlor-alkali project, which is operated by the East China branch. The tank weighs 42 tons, has a diameter of 11.5 meters and a height of 12.5 meters. Its precise installation marks the completion of the installation of all large-scale equipment at this project in Jujuy, Argentina, representing a key milestone toward achieving the annual targets. For this lifting operation, a 400-ton truck crane was used as the main equipment; through precise scheduling and scientific approaches, it was possible to lift the components, which weighed approximately 50 tons in total, smoothly. The task team maintained precise control throughout the process, ensuring that the components were removed from the molds accurately and transported safely to the designated installation location 21 meters away. The entire process was safe, controllable, efficient, and smooth, laying a solid foundation for the high-quality advancement of this project’s key stages. (Qi Qin) Postscript: To fully showcase the practical efforts of various subsidiaries in achieving their annual goals with high quality, the company launched the column 【Striving Hard in the Fourth Quarter to Achieve Success in the 14th Five-Year Plan – Continuous Good News】 on October 15; this is now the 9th issue. It fully showcases the concrete measures taken by various subsidiaries to overcome challenges with determination, solve problems through innovative thinking, and drive implementation with a spirit of hard work. It motivates all employees to act with a sense of urgency that time waits for no one and a sense of responsibility that says \"no one else but me can do it,\" to go all out in the fourth quarter, secure success during the 14th Five-Year Plan period, and ensure the successful completion of all annual goals and tasks, thereby contributing to the company’s goal of high-quality development. Source: Northwest Branch, East China Branch. Editor for this issue: Yang Lili. Chief editor: Sun Boxin. Reviewer: Ma Haixia. Recommended readings↓↓↓
Reply #22025-11-12
On February 24, 2023, the signing ceremony for the memorandum of understanding regarding the Aoyama South American chlor-alkali chemical project was successfully held in Jujuy Province, Argentina. This hydrochloric acid plant is Qingshan’s second project in South America, following the joint venture project at the Centenario Salt Lake in Salta, Argentina; it holds significant strategic importance as it ensures a timely and adequate supply of the chemical raw materials needed for the Centenario Salt Lake lithium mining project ; The production cost of lithium carbonate can be further reduced ; It can reach the world’s largest lithium resource cluster, the \"Lithium Triangle,\" serving as an important catalyst for the further development of Aoyama New Energy’s operations in South America. At the same time, this project represents Aoyama’s first investment in Jujuy Province, Argentina, and it has received strong support from the governor and the provincial government. Its efficient team worked together with Aoyama’s team for several months to ensure the smooth initiation and progress of the project. The project is located in the Perico Industrial Park; the construction period is expected to be 18 to 24 months, and it will create hundreds of job opportunities for the local community. It is reported that the first phase of the hydrochloric acid plant is expected to have an annual production capacity of 100,000 tons of hydrochloric acid and 35,000 tons of caustic soda. The project’s main raw materials come from salt lake brine, and its products are almost entirely supplied to lithium mining in salt lakes; as a result, it has become an important link in Argentina’s development of the lithium industry chain. The project has received strong support from the group’s leadership, and the South American management team has also made thorough preparations. In addition to Chairman Li Jing taking the lead in project development, General Manager Xiang Jinqiang conducted site inspections for the industrial park project, while Financial Director Lv Shen carried out extensive preparatory work for project financing. Image
Reply #32025-11-12
The first piece of equipment for the chlor-alkali project in Jujuy, Argentina, was successfully lifted onto its site on 2025-06-16. The first equipment unit of the chlor-alkali plant in Jujuy, built by Erhua Jian, was installed in place with precision, marking the official start of the equipment installation phase for this province’s first modern chlor-alkali project. Faced with the challenges of a Spanish-speaking work environment, the project team innovated its working methods. From safety training and visual presentation of drawings to the development of multilingual checklists and on-site guidance, the team worked closely together and managed to complete the entire process of unpacking, inspecting, transporting, and installing the equipment efficiently within just 3 hours. This represents a successful application of standard gesture commands by operators from China and Argentina, overcoming the language barriers that arise during the lifting of heavy equipment. The success of this lifting operation marks the full implementation of China’s chemical engineering construction standards in the South American market. This project represents another proactive effort by Erhua Jian to advance the Belt and Road Initiative and enhance the influence of its international brand, contributing Chinese wisdom and strength to the development of the global new energy industry.
Reply #42025-11-12
【HaiChuan Insights】World’s largest 65-ton \"giant\" lithium-ion counterbalance forklift produced in China https://bbs.hcbbs.com/thread-5705119-1-1.html (Source: HaiChuan Chemical Forum)
Reply #52025-11-13
【Ten Years of Rapid Development in Chemical Processing Equipment】From 2816 to 2025: The robot-based automatic loading machines developed by Changzhou Daojin have solved the problem of difficult loading. https://bbs.hcbbs.com/thread-5705014-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #62025-11-13
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s first carbon dioxide + flywheel energy storage demonstration project was completed in Deyang, Sichuan, from 2003 to 2022. https://bbs.hcbbs.com/thread-5704593-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #72025-11-14
【Ten Years of Rapid Development in Chemical Equipment】Major breakthroughs achieved in key technologies for turning phosphogypsum from waste into a valuable resource from 2017 to 2025 https://bbs.hcbbs.com/thread-5705021-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #82025-11-14
【Ten Years of Rapid Development in Chemical Processing Equipment】From 2018 to 2025, Donghua Company’s graphene-based anti-corrosion coatings produced via gas-phase synthesis were included in the list of innovations recommended by central state-owned enterprises. https://bbs.hcbbs.com/thread-5705057-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #92025-11-14
【Ten Years of Rapid Development in Chemical Processing Equipment】From 2018 to 2025, Donghua Company’s graphene-based anti-corrosion coatings produced via gas-phase synthesis were included in the list of innovations recommended by central state-owned enterprises. https://bbs.hcbbs.com/thread-5705057-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #102025-11-14
【Ten Years of Rapid Development in Chemical Engineering Equipment】The fuel supply system project for the II Chemical Construction Antarctic Ross Sea hub has officially entered the phase of actual construction. https://bbs.hcbbs.com/thread-5704834-1-1.html (Source: Haichuan Chemical Forum)

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.