Thread Content
Good news came in on November 20th from the Rongsheng New Materials Zhejiang Jintang project, where Daji Company was responsible for the lifting operations. The two key components of Pier 6#, namely GZQ8 and GZQ9, were successfully lifted, enabling the project to progress at an accelerated pace thanks to the robust capabilities used in these lifting operations. The two piers that were lifted this time weighed 57.4 tons for GZQ8 and 57.5 tons for GZQ9; a 750-ton truck crane was used as the main lifting device, with the assistance of a 500-ton truck crane. The successful completion of this lifting task is yet another outstanding achievement by Daji Company in its efforts to \"work hard in the fourth quarter and secure success in the 14th Five-Year Plan period\".
【Ten Years of Rapid Development in Chemical Equipment】2847-2025: The first domestically produced million-ton-scale methanol synthesis reactor passed the factory acceptance test. https://bbs.hcbbs.com/thread-5706030-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
[Common Issues in Haichuan Pipeline Design] – A compilation post; images and text are being updated. Feel free to join the discussion: https://bbs.hcbbs.com/thread-5705828-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Basic Safety Requirements for Work at Heights https://bbs.hcbbs.com/thread-5706329-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Lack of rain protection for the vent pipes on gas valve assemblies in work areas https://bbs.hcbbs.com/thread-5706346-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with pictures and texts; everyone is welcome to participate in the discussion. https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】2847-2025: The first domestically produced million-ton-scale methanol synthesis reactor passed the factory acceptance test. https://bbs.hcbbs.com/thread-5706030-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Processing Equipment】2848-2025: Zhanghua Machinery’s production of clean workshop facilities, TA2G titanium materials, and ammonia-containing condensate stripping towers – delivery completed. https://bbs.hcbbs.com/thread-5706081-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
【Haichuan Chemical Plant Accident Case】15 Dead, 180 Injured! Warning from the BP Texas refinery accident: “Budget cuts” can trigger serious cascading risks” https://bbs.hcbbs.com/thread-5706578-1-1.html (Source: HCBBS Chemical Forum)
【Ten Years of Rapid Development in Chemical Processing Equipment】From 2850 to 2025: HBIS Group launches domestically the first 1700mm ultra-wide-section high-grade petroleum pipeline steel products https://bbs.hcbbs.com/thread-5706292-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))