The integrated wind and solar hydrogen production project in Wushen Banner, Inner Mongolia Zhongtian Hechuang, is expected to be completed by the end of August next year

2025-12-17View Original

Thread Content

The integrated wind and solar hydrogen production project in Wushen Banner, Inner Mongolia Zhongtian Hechuang, has entered the winter construction phase since it started operations in March this year. At present, the project team is advancing the project in strict accordance with the winter construction plan, aiming to complete the roofing of the facilities for the 6 electrolyzers by the end of this year, as well as finish welding and heat treatment of the 6 hydrogen storage tanks, thereby laying the foundation for pressure testing next year. The project is expected to be completed by the end of August next year, achieving the hydrogen production target. https://p3-sign.toutiaoimg.com/tos-cn-i-tjoges91tu/448d949afa6ac964e20ecace5cdc14e0~tplv-tt-origin-web:gif.jpeg?_iz=58558&from=article.pc_detail&lk3s=953192f4&x-expires=1766533036&x-signature=XYvN8%2By6OKfZL4Z67L%2B0e2qPzVk%3D The total investment in this project is 1.69 billion yuan; taking advantage of Ordos’ abundant wind and solar resources, it plans to build wind turbines with a capacity of 450 megawatts and photovoltaic systems with a capacity of 236.8 megawatts. Hydrogen will be produced using alkaline electrolysis technology, with an annual output of 30,000 tons of green hydrogen. Once completed, the project will effectively enhance the capacity of green hydrogen-integrated coal chemical industries to reduce carbon dioxide emissions, enabling the reduction of 1.22 million tons of carbon dioxide per year and facilitating the development of higher-quality, more diversified products with lower carbon footprints. This project has been selected as part of **the first batch of hydrogen pilot projects in the energy sector**. It serves as an important example for implementing the \"dual carbon\" strategy and building a green energy system, as well as a key practice for developing new models of green and low-carbon development. It will inject new momentum into regional energy transformation and industrial upgrading.
Reply #22025-12-17
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with pictures and texts; everyone is welcome to participate in the discussion: https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #32025-12-17
[Common Issues in Haichuan Pipeline Design] – A compilation post; images and text are being updated. Feel free to join the discussion: https://bbs.hcbbs.com/thread-5705828-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #42025-12-17
【Ten Years of Rapid Development in Chemical Engineering Equipment】Full capacity operation achieved for China’s most remote offshore wind power projects by 2025 https://bbs.hcbbs.com/thread-5708401-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #52025-12-17
【Ten Years of Rapid Development in Chemical Engineering Equipment】Full capacity operation achieved for China’s most remote offshore wind power projects by 2025 https://bbs.hcbbs.com/thread-5708401-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #62025-12-20
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2029 to 2025, Beijing Haideliz developed its own 30-kilowatt methanol-hydrogen combined heat and power system, which was then delivered. https://bbs.hcbbs.com/thread-5708466-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #72025-12-20
【Ten Years of Rapid Development in Chemical Processing Equipment】2903-2025: Domestic seawater pumps for the Shanghai Apollo Jiangsu LNG receiving station passed operational tests https://bbs.hcbbs.com/thread-5708495-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #82025-12-21
【Ten Years of Rapid Development in Chemical Equipment】Breakthroughs from 2905 to 2025! SHanghai Electric’s 300MW-class large-scale air turbines ensure the operation of China’s salt cavern compressed air energy storage demonstration project https://bbs.hcbbs.com/thread-5708518-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #92025-12-21
【Ten Years of Rapid Development in Chemical Equipment】2907-2025: China’s First Civilian Liquid Hydrogen Plant Obtains Safety Production Permit https://bbs.hcbbs.com/thread-5708618-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #102025-12-21
【Ten Years of Rapid Development in Chemical Processing Equipment】The world’s largest 9600 Nm³/h multi-functional hydrogen production BOP system was successfully delivered https://bbs.hcbbs.com/thread-5708761-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #112025-12-22
【Ten Years of Rapid Development in Chemical Processing Equipment】From 2009 to 2025, Ningmei Group made significant progress in the key technologies related to the extraction of rare gases such as krypton and xenon from ultra-large air separation units. https://bbs.hcbbs.com/thread-5708777-1-1.html (Source: Hchuan Chemical Forum (Hchuanliu hcbbs))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.