【Daily Question No. 21】2017.07.28

2017-07-28View Original

Thread Content

【Daily Question No. 21】July 28, 2017: The tasks to be carried out before opening a low-temperature tank container include (). A. Check whether the materials and accessories are complete. B. Verify that the pipe connections are secure. C. Check whether the valves rotate smoothly. D. Check whether the pressure gauge and level indicator are functioning properly. The reference answers will be visible after response; scoring is based on identifying the key points. (Unless otherwise specified, all questions and answers are based on hydrogenation units.) ) ABCD scoring criteria: 2 Wealth points for incorrect attempts; *incomplete* answers result in 3–8 points. 10 Wealth points are awarded for correct answers, along with a detailed explanation; if additional *answers* are provided, 15–20 Wealth points are given. Please use these criteria for scoring. Note: If there are editing records after answering, only points will be awarded to those who participated. For continuous malicious spamming, 2 points will be deducted each time, with no upper limit. Pure numbers, pure emojis, or random letters that have nothing to do with the answer are all considered malicious spamming; points will start to be deducted after three warnings. 2017 Q&A Summary Thread (updates have begun) http://bbs.hcbbs.com/thread-1657793-1-1.html 2017 Daily Question Summary Thread (updates have begun) http://bbs.hcbbs.com/thread-1657794-1-1.html 2016 Q&A Summary Thread (updates completed) http://bbs.hcbbs.com/thread-1597792-1-1.html Petrochemical Sector – “Creative Ideas for Energy Savings” campaign (the second phase is in full swing) http://bbs.hcbbs.com/thread-1666758-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #22017-07-28
The tasks before opening a low-temperature tank container include (ABCD). A. Check whether the materials and accessories are complete. B. Verify that the pipe connections are secure. C. Check whether the valves rotate smoothly. D. Check that the pressure gauge and level indicator are in good condition

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.