Air-temperature carburetor

2017-11-21View Original

Thread Content

There is a claim that when selecting an air-cooled vaporizer, it is necessary to choose one with a flow rate 2-3 times higher than the actual steam demand of the equipment, as air-cooled vaporizers are prone to frosting and freezing, which can affect heat exchange and the vaporization efficiency. This is especially true in cases where there is no backup unit available. Is this correct? Also, at a standard nitrogen flow rate of 5–10 MPa, the recommended flow speed is 2–5 m/s. What is the reason for this? In actual production, if 350 cubic meters of nitrogen per hour is required, and based on this flow rate a DN150 pipe is needed, is that too large?
Reply #22017-12-01
An air-temperature gasifier requires a backup unit

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.