How are the quantity and outlet pressure of the natural gas liquefaction unit and the mixed refrigerant compressor determined?

2024-01-25View Original

Thread Content

Help: How to calculate the quantity and outlet pressure of natural gas liquefaction units and mixed refrigerant compressors? Or are there any standards or design manuals that explain how to calculate it? Thank you.
Reply #22024-01-25
The determination of the number of mixed-refrigerant compressors and their outlet pressures in a natural gas liquefaction unit is usually based on the following factors: 1. Natural gas liquefaction process: Different liquefaction processes (such as C3MR, AP-X, DMR, etc.) have varying requirements for compressors. 2. Designed capacity: The designed processing capacity of the liquefaction plant determines the number of compressors required and the size of each compressor. 3. Refrigerant circulation requirements: The type and quantity of refrigerant in circulation determine the properties of the fluid compressed by the compressor, affecting the selection of the compressor and the pressure settings. 4. Compressor configuration: Series, parallel, or a combination of both affects the capacity of each individual unit as well as the overall outlet pressure. Calculating the capacity and outlet pressure of a compressor typically requires the application of thermodynamic and fluid dynamics principles, as well as taking into account various parameters such as pressure, temperature, and flow rate under actual operating conditions. Relevant engineering design standards and manuals can be referred to during design, such as the American Petroleum Institute standard API 619 for the design and manufacture of rotary displacement compressors, and the ASHRAE Handbook. Actual design calculations need to be carried out by professional engineers based on specific circumstances. .

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.