HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Issues related to starting up the gas separation unit after maintenance

2022-12-08View Original

Thread Content

I started the machine without carrying out maintenance on the gas separation unit. What is the general procedure for starting the machine after maintaining the gas separation unit? Is steam purging still needed? Is it still necessary to fill with nitrogen for pressure testing and leak testing after purging? Also, does the system need to be purged of air before introducing liquefied gas? Please share how you operate it, thank you
Reply #22022-12-09
A single explanation for this series of problems is the lack of understanding of the production principles of the equipment. 1. It is necessary to establish the unit’s operating procedures in accordance with the instructions provided by the unit itself or the equipment manufacturer. 2. Why use steam purging? 3. Why is pressure testing necessary, and why is nitrogen used for pressure testing? 4. Why remove the air? Additionally, should relevant follow-up actions be established for the areas involved in the maintenance work??? For newly installed equipment, it is necessary to obtain the operation manual from the design institute and the equipment manufacturer. If you are a new employee, it is best to consult the technical staff around you. For reference.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.