Construction period for 400-ton gas turbine compressor

2018-08-31View Original

Thread Content

There are several gas turbine compressors weighing over 400 tons that need to be installed on the project, and the installation location is on the first floor of the steel structure platform. I would like to ask the members of this forum: how long does it generally take to install a compressor like this? Thank you very much
Reply #22018-08-31
The compressor can be installed quickly; it takes about two days to install one unit, while the high-pressure motor requires one day due to the alignment process as well as the need for the oil to circulate for a while. In general, once all conditions are met for operation, it takes around 15–20 days from installation to commissioning.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.