Why are the measurements of the bearing shell clearance obtained using the false shaft method and the lead wire compression method roughly the same?

2019-08-18View Original

Thread Content

Why do the results obtained using the fake shaft method and the lead wire compression method for measuring the bearing shell clearance be almost identical, with only a deviation of 0.01 mm? The tile consists of five equilateral tiles; due to the tilting effect of the tiles, it seems that for this five-tile structure, the correction factor of C=0.894 is not applicable. I consulted brick manufacturers, and their methods were similar with basically the same results. C=0.894 is the correction factor; is it applicable to five irregularly shaped tiles?
Reply #22019-08-22
Stop joking – a deviation of 0.01 meters; is it really necessary to use lead wire for measurement? It can be measured with just the fingers.
Reply #32019-08-23
:L, the input is incorrect. It should be 0.01mm

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.