On August 29, good news came from the third acrylonitrile workshop of Jilin Petrochemical Company’s acrylonitrile plant: following systematic technical upgrades, the chiller on Line B of the third acrylonitrile unit successfully overcame the challenges posed by high temperatures during summer. Multiple operating parameters of this unit reached their best levels in recent years, achieving the finest condition since it was put into operation in 2010. “With only 5,000 yuan spent on materials and renovation costs, this improvement ensured the stable operation of the compressor for 48,000 hours and reduced the need for scheduled maintenance. It is estimated that costs related to construction and spare parts were saved by around 500,000 yuan, thus achieving the goal of efficient operation with minimal investment – a true example of ‘low cost, high returns’. ”The project leader said. As the core equipment of the acrylonitrile plant, the chiller plays a vital role in supplying chilled brine to the entire facility; its operating condition directly determines whether the plant can operate at full capacity throughout the summer. However, in recent years, this equipment has been facing issues such as high vibration levels, deviations in rotational speed settings, and inconsistent liquid level readings, which not only affect operational efficiency but also pose safety risks. In the face of this challenge, the factory assembled its technical experts and worked together with equipment manufacturers to form a dedicated task force that carried out a series of precise and efficient technical efforts, thereby promoting a shift in equipment management from \"reactive maintenance\" to \"proactive prevention\". During the detailed disassembly and repair of the chiller compressor, the troubleshooting team found that the retaining rings of the second and third stage balance tubes were structurally damaged, with significant wear on their outer surfaces, which severely hindered the stable operation of the unit. To address this underlying issue, the team developed an innovative modification plan: by adjusting the structure and dimensions of the retaining ring, as well as increasing the outer diameter of the balance tube, it was possible to effectively suppress the radial movement of the balance tube under extreme operating conditions ; At the same time, increasing the length of the balance tube reduced axial movement, thereby eliminating the risk of vibration in the unit caused by damage to the balance tube. Key parameters such as unit vibration and displacement decreased significantly, and the readings from the main vibration monitoring point XE-403 also showed a steady decline, completely eliminating the risk of vibration alarms. At the same time, the project also enables remote monitoring of three key liquid levels, including those of the evaporator, allowing operators to monitor the real-time operating status of the unit; this significantly improves the accuracy of system control as well as the ability to respond to emergencies.
Reply #22025-09-04
【Ten Years of Rapid Development in Chemical Processing Equipment】China’s first 90MPa high-pressure compressor passed project acceptance in 2025 https://bbs.hcbbs.com/thread-5700513-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #32025-09-05
【Ten Years of Rapid Development in Chemical Equipment】The largest cumene hydrogenation project in China, carried out by Guangxi Hongkun, was successfully completed and officially handed over on 2651-2025. https://bbs.hcbbs.com/thread-5700563-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #42025-09-05
【Ten Years of Rapid Development in Chemical Processing Equipment】2652-2025: Key breakthroughs achieved in the application of methanol new energy pipeline transportation technology in complex terrains in China https://bbs.hcbbs.com/thread-5700596-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #52025-09-05
【Ten Years of Rapid Development in Chemical Engineering Equipment】2653–2025: Completion of the First Pipeline Laying in China’s Largest Middle East Pipeline Project to Date https://bbs.hcbbs.com/thread-5700633-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #62025-09-05
【Ten Years of Rapid Development in Chemical Engineering Equipment】2653–2025: Completion of the First Pipeline Laying in China’s Largest Middle East Pipeline Project to Date https://bbs.hcbbs.com/thread-5700633-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #72025-09-06
【Ten Years of Rapid Development in Chemical Engineering Equipment】New breakthroughs achieved in China’s low-temperature carbonization technology for coal from 2016 to 2025 https://bbs.hcbbs.com/thread-5700695-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #82025-09-08
【Ten Years of Rapid Development in Chemical Equipment】Self-developed from 2657 to 2025! CNPC’s 100-kilowatt-class large-temperature-difference transcritical carbon dioxide air-source heat pump units put into operation https://bbs.hcbbs.com/thread-5700807-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #92025-09-08
【Ten Years of Rapid Development in Chemical Equipment】2658-2025: China’s first adsorption tower circulating oil pump was successfully tested at Jiujiang Petrochemical https://bbs.hcbbs.com/thread-5700823-1-1.html (Source: Haichuan Chemical Forum)
Reply #102025-09-09
【Ten Years of Rapid Development in Chemical Engineering Equipment】The 2659-2025 project on \"Research and Development of Key Technologies for Hydrogen-Blended Natural Gas (HCNG) Internal Combustion Engines and Their Demonstration Applications\" has completed its evaluation process. https://bbs.hcbbs.com/thread-5700860-1-1.html (Source: Haichuan Chemical Engineering Forum)
Reply #112025-09-09
【Ten Years of Rapid Development in Chemical Engineering Equipment】The 2659-2025 project on \"Research and Development of Key Technologies for Hydrogen-Blended Natural Gas (HCNG) Internal Combustion Engines and Their Demonstration Applications\" has completed its evaluation process. https://bbs.hcbbs.com/thread-5700860-1-1.html (Source: Haichuan Chemical Engineering Forum)

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.