The core rotor assembly of the 9.8-ton large compressor project under development at Chongqing General has been successfully assembled in one go in the final assembly workshop!

2026-01-04View Original

Thread Content

Recently, Chongqing General Industrial (Group) Co., Ltd. (referred to as “Chongtong Group”) made a breakthrough in its large-scale compressor project: the core rotor assembly, weighing 9.8 tons in total, was successfully assembled in one go in the final assembly workshop! With its performance in breaking both the weight and diameter records for similar assemblies at Chongtong Group, this component has been successfully installed, marking a crucial step forward in the delivery of this key project. The rotor is the “heart” of the compressor, and its assembly precision directly determines the performance and reliability of the entire unit. The size and weight of this rotor set impose extremely high requirements on coaxiality and fit clearance, posing assembly challenges of unprecedented severity. The Process Technology Department carried out thorough planning, developed detailed specialized assembly plans and emergency response protocols, and provided on-site technical support throughout the entire operation. During the production period, the process and assembly teams worked in close collaboration. Process engineers are stationed on the front line, providing real-time data and decision support to swiftly respond to any minor changes during assembly ; The operators in the final assembly workshop, thanks to their superb skills and extensive experience, strictly adhere to the process requirements, carrying out their tasks with precision and care. Through close cooperation, both parties managed to overcome a series of challenges, including the difficulties associated with lifting and positioning heavy components as well as the high requirements for precision control. As a result, the rotor was successfully introduced smoothly and placed accurately, with all key technical specifications being met from the first attempt. The successful one-time assembly of this heavy rotor set demonstrates CHINT Group’s technical expertise and team efficiency in the field of assembling heavy-duty, high-precision equipment. It also provides valuable experience for subsequent key processes such as closing the casing.
Reply #22026-01-04
【History of Haichuan Chemical Industry】The Engine of Civilization: A Thousand-Year Evolution of Pumps https://bbs.hcbbs.com/thread-5710250-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #32026-01-04
【Ten Years of Rapid Development in Chemical Engineering Equipment】2942-2025: China’s first domestically produced 300-megawatt class heavy-duty gas turbine put into operation https://bbs.hcbbs.com/thread-5709928-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #42026-01-04
【Ten Years of Rapid Development in Chemical Engineering Equipment】2942-2025: China’s first domestically produced 300-megawatt class heavy-duty gas turbine put into operation https://bbs.hcbbs.com/thread-5709928-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #52026-01-04
The 【Haichuan Equipment Guessing】 series will continue to be updated in 2027 – all Haichuan fans are welcome to participate actively! https://bbs.hcbbs.com/thread-2079686-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
Reply #62026-01-05
【Ten Years of Rapid Development in Chemical Equipment】From 2025 to 2035, China’s first green and intelligent production line capable of producing carbon nanotubes on a scale of 1,000 tons per year was put into operation successfully. https://bbs.hcbbs.com/thread-5710299-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
Reply #72026-01-05
【Haichuan Equipment Guessing Game】Why don’t these bicycles have wheels? The people I know must be really amazing! https://bbs.hcbbs.com/thread-5710458-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #82026-01-05
【Ten Years of Rapid Development in Chemical Engineering Equipment】China Petrochemical’s First Supercritical Once-Through Reheating Unit Successfully Commissioned 2952-2025 https://bbs.hcbbs.com/thread-5710462-1-1.html (Source: Haichuan Chemical Engineering Forum (HCBBS))
Reply #92026-01-06
【Ten Years of Rapid Development in Chemical Equipment】The ammonia and hydrogen storage system at Qinghai Asia Silicon Poly-Silicon Co., Ltd., a project supervised by Tianhua Institute from 2025 to 2035, was successfully commissioned in just one attempt. https://bbs.hcbbs.com/thread-5710544-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.