HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

The natural gas cylinder is evacuated before filling; what level of vacuum is considered acceptable?

2017-03-13View Original

Thread Content

Article 30, Point 4 of TSG R0009-2009: It is strictly prohibited to fill gases into \"new cylinders or cylinders that have been inspected regularly and are being filled for the first time, without undergoing purification or vacuuming processes\". It is not specified here how many qualified ones need to be drawn? The company’s chief engineer asked about this issue last time; how can one give a well-founded answer? GB 24162-2009 specifies the requirement for vacuuming (replacement with nitrogen is also acceptable), but it does not state what level is considered satisfactory. Isn’t this standard not very rigorous? When evacuating, it’s impossible to reach -0.1 MPa under any circumstances.
Reply #22017-03-13
I’ll hold things up for you; looking forward to replies from experts............

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.