About safety valve plus hand valve

2017-11-22View Original

Thread Content

Safety technical supervision regulations for safety valves TSG ZF001-2006 stipulates as follows: The provisions of the large capacity regulations are as follows:: The difference lies in the presence or absence of the "approval by the safety director of the user unit". So, how do we implement it in actual work?
Reply #22017-11-22
Basically all of them are equipped with valves, lead seals and normally open signs. There is no approval process.
Reply #32017-11-22
The design of the project is different. Some institutes have designs and some do not. We all add them ourselves. We follow the approval process of engineering system technology and project quantities. There is no need for the safety person in charge to sign and approve specifically. The production system safety department adds lead seals and tags when the work is handed over.
Reply #42017-11-22
Basically all safety valves in our company have valves in front of them. Otherwise, how can the safety valves be disassembled and inspected during operation?
Reply #52017-11-22
It is strictly forbidden to add hand valves to the power system, but in the chemical industry, they are usually included in the design.
Reply #62017-11-23
The purpose of adding a valve is to facilitate the safety valve's effectiveness. When put into use, the hand valve is fully opened and sealed.
Reply #72017-11-23
If locked or sealed, the switching process needs to be approved.
Reply #82017-11-23
Usually it is added, how can I replace the safety valve if I don't replace it. But this needs to be managed according to the requirements of the regulations.
Reply #92017-11-23
There are several situations in actual work: design stage: At the beginning of the design, the issue of safety valve and shut-off valve is involved. Does it need to be clarified in the design commission? Or implement the design regulations of the design institute? Installation stage: The original design does not have a shut-off valve. If it is required to be added during construction and installation, the consent of the design institute must be obtained and a design change operation phase shall be issued.: The operating device (old device) needs to add a shut-off valve. How is it actually implemented?
Reply #102017-11-23
Nowadays, design institutes usually start adding hand valves and lead sealing chains on the design drawings.
Reply #112017-11-23
1. Many safety valves in old installations do not have front and rear shut-off valves. 2. New devices are generally equipped with front and rear shut-off valves. 3. If the old installation needs to add safety valves and front and rear shut-off valves, the formal procedure should be entrusted to the design institute to produce drawings before implementation.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.