HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

The connection method between the bottom plate of the container ear support and the steel structure

2018-11-27View Original

Thread Content

The bottom plate of the container ear support and the steel structure are connected by welding and bolting. If it is a bolted connection and the section steel connected to the support is an I-beam (the web of the I-beam is vertical and the flange is horizontal), drill two holes on the bottom plate of the support and drill two holes on the flange on the outside of the I-beam (with the web as the dividing line and the side of the container as the inside), and then connect with screws.
Reply #22018-12-08
1. Master, how should I install it if it is a concrete floor? 2. If the equipment is to be placed downward, how should the support ears be connected to the steel beam?
Reply #32019-02-14
The part that supports the connecting equipment is generally made of welded H-shaped steel. The flange width can be designed according to needs, and the structure of the supporting equipment is generally made of Bagua beams.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.