HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

One-line diagram drawing

2021-02-04View Original

Thread Content

How to mark the welding joint of such a pipeline? At what distance should we mark a welding joint?
Reply #22021-02-05
The welding spots are determined according to the installation size needs of the pipe fittings and the pipe transportation needs, and are not evenly distributed.
Reply #32021-02-12
The welding number is generally not marked on the design drawings. When the construction unit receives the drawings and before starting work, the technical staff will prepare a unified welding number. For straight pipes (without socket welding), there are no pipe fittings in the middle and direct butt welding connections. According to the length of the pipe, it is not appropriate to add a welding port to 6 meters.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.