Regarding pressure pipeline matters

2021-05-07View Original

Thread Content

Dear colleagues, during the regular inspection of our pressure pipelines, we identified the following issues: 1: The specifications and models of some pressure pipelines do not match those specified in the design drawings; 2: The length of some pipes does not match the design drawings ; 3: Some pipes actually exist, they are listed on the design drawings as well as in the registration sheet. Now we need to make changes at the Quality Supervision Bureau, but what is the procedure? Do we first need the design institute and the installation company to submit design and installation change requests, or do we have to cut the pipes again, weld them anew, and take X-rays? According to TSG D0001-2009, is it necessary to follow this process based on the nature of the modification?
Reply #22021-05-07
A simple technical upgrade should suffice, right?
Reply #32021-05-07
I’m asking about this issue in order to get specific guidance on how to do it, and what the steps are roughly. Your reply is not very useful to me. :(
Reply #42021-05-07
Prepare a technical renovation plan and find a design institute to produce the drawings
Reply #52021-05-07
Based on the drawings provided by the original designer, does the installation party also need to provide installation instructions and an installation plan? Is it similar to having to go through the new pressure pipeline installation procedure again?
Reply #62021-05-07
It’s not necessary to go through the original design institute, right? As long as one has the necessary qualifications, that should be sufficient
Reply #72021-05-07
(2) The process of modification or major repair (excluding the pipeline construction process for emergency repairs) (Note 1-4), in which the total length of pipelines carrying the same medium is replaced at one time and exceeds 100 meters. Notes 1-4: The renovation of pressure pipelines refers to activities that involve changing the specifications, material, or structural layout of the pipelines, or altering working parameters such as the medium, pressure, and temperature within the pipelines, thereby resulting in changes in the performance parameters or structure of those pipelines.
Reply #82021-05-09
One should ask the local authorities for specific requirements in this regard. In our case, sometimes it’s sufficient to go through the process again, while other times reinstallation is necessary. It is essential for design institutes to produce drawings.
Reply #92021-05-09
Mm-hm. I’ve already started working on it
Reply #102021-05-11
For pressure pipelines or other toxic pipelines, it is necessary to submit them for inspection to the special inspection agency during the construction phase; only after the agency has made a record can further acceptance procedures take place. If pipes are added or their routes are changed during construction, the design unit must issue corresponding changes

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.