HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Should FG or G be used for welder projects of plug-in and fixed composite structures?

2023-12-30View Original

Thread Content

Dear teachers, according to the interpretation of the old examination rules; Class D joint pipe + plate — 1) A groove is cut in the pipe; it belongs to the butt-welding structure type, and is covered by Class G welder qualifications (see Figures 1 and 2) ; 2) When a groove is made on the plate and it is of insert-type structure, should it be covered by FG category codes (Figure 3)? For a structure like the one shown in the appendix of GB/T150.3, where grooves are made on both the pipe and the plate, resulting in a composite structure that is both insert-type and fixed-type, should it be covered by G or FG category codes?
Reply #22023-12-30
For composite structures with insert-type and embedded types, the FG category of welder qualifications should be used for coverage. .
Reply #32024-01-02
Hello, is there any relevant source or standard definition?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.