Thread Content
Let’s give praise and support to the achievements made in China’s chemical engineering technology and equipment; your participation in discussions is the greatest encouragement. **********************【Ten Years of Great Development in Chemical Engineering Equipment】Regular updates and summaries are available; feel free to join the discussions: https://bbs.hcbbs.com/thread-3576046-1-1.html *****************On June 18th, a grand ceremony was held to mark the shipment of the No. 2 propylene distillation tower for the China Coal Yulin Advanced Coal Processing Base project. This \"steel giant\", standing 113.5 meters tall, weighing over 1,385 tons, and with a diameter of 7.6 meters, as the tallest and largest tower in the project, was officially delivered to the owner. The China Coal Yulin project is the first large-scale coal chemical project to be approved following the implementation of the **\"dual carbon\" strategic goals, and it holds great significance. For the project’s 900,000 tons per year olefin separation unit, 2.35 million tons per year methanol-to-olefins unit, and other associated facilities, Hailu Heavy Industry manufactured 17 key core pieces of equipment. The 2# propylene distillation column shipped this time is extremely difficult to manufacture; it features large dimensions and numerous diameter changes, with complex welding and pressure testing processes, as well as significant challenges in maintaining straightness and ovality. In the face of these challenges, the management, technical, and production teams at Hailu Heavy Industry worked day and night for 190 days, starting from the arrival of the first steel plate on December 10, 2024. They not only completed the manufacturing process with high quality but also set a new record by achieving this in just 190 days – the shortest time ever recorded for manufacturing equipment weighing over 1,385 tons – thus securing valuable time for the project’s progress.
The largest column in the MTO unit.
【Ten Years of Rapid Development in Chemical Equipment】2451-2025: Shandong Lijin’s first domestic integrated production facility for 100,000 tons per year of ASA resin comes online https://bbs.hcbbs.com/thread-5695442-1-1.html (Source: Haichuan Chemical Forum)
【HaiChuan Safety Discussion】Third Party Intervention https://bbs.hcbbs.com/thread-5695460-1-1.html (Source: HaiChuan Chemical Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】The first manhole welding station in China’s boiler industry was established and put into use at Dongfang Boiler from 2024 to 2025. https://bbs.hcbbs.com/thread-5695533-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Equipment】The world’s first production line capable of manufacturing 1,000 tons per year of cellulose fibers regenerated using the ionic liquid method (Cellosolve) was put into operation from 2024 to 2025. https://bbs.hcbbs.com/thread-5695574-1-1.html (Source: Haichuan Chemical Industry Forum)