HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Calculation method for the time required to pressurize a heat exchanger

2017-07-03View Original

Thread Content

For a heat exchanger that requires pressure testing to check for leaks, the pressure needs to be raised to 2.65 MPAG. The volume of the heat exchanger is 30 cubic meters. There is a pressure pump with a designed flow rate of 20 M3/H; it is planned to use high-pressure nitrogen to reach a pressure of 2.0 MPA, and then an air compressor to bring the pressure up to the designed level of 2.65 MPAG. How much time will it take to raise the pressure from 2.1 MPAG to 2.65 MPAG?
Reply #22017-08-21
Leave your name; our equipment is too small, and no one does this calculation yet – we’ll learn how to do it soon

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.