HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Impact of heat exchanger shutdown on scale formation

2021-10-02View Original

Thread Content

During the annual shutdown for maintenance, if the water or liquid accumulated inside heat exchange equipment is not drained promptly or thoroughly, scaling is more likely to occur under conditions of relative stillness. Therefore, when the equipment is shut down, especially for an extended period of time, attention should be paid to the drainage and maintenance of the heat exchanger

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.