HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

There are specifications regarding mechanical equipment requirements

2020-05-20View Original

Thread Content

Recently, an integrated unit of the condensate recovery type was installed. During the initial alignment process, the supervisor was called in for inspection. The base was aligned using shims at first; in accordance with section 6.3.8 of standard 3538, which deals with leveling and aligning machinery using shims, the supervisor checked these shims by using feelers and a hammer to strike them, and found some issues. I checked the 3538 standard, but it’s not clear from the standards whether the requirement in 6.3.8 applies only once or twice
Reply #22020-05-21
It is recommended not to worry too much about this issue; rather, it’s important to do what needs to be done. Passing the inspection is what truly matters, and there’s no need to focus on whether it’s the first or second attempt. Supervisor, you know what to do: shutup:

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.