The construction supervisor organizes personnel to conduct a thorough and careful inspection along the belt; all tools on the belt or any items that could affect its operation are removed, and all tools as well as remaining materials in the tunnel are collected and taken away from the construction site. The area is cleared of debris, and the control room is informed. Work can only be completed upon passing the inspection. Preparations before construction: 1. Before starting work, it is necessary to report to the dispatcher in the mine control room and the monitor in the surveillance room; construction can only proceed with their permission ; After completion, report the completion instructions to the monitor and dispatcher. 2. Before commencement of work, the person in charge of construction must implement proper safety precautions, and all personnel involved in the construction must study these safety measures carefully. 3. Before construction, the construction supervisor is responsible for having all personnel on site sign again to confirm compliance with this measure sheet. 4. The Safety Supervision Section is responsible for assigning a safety officer to supervise the site, taking full responsibility for safety during the operations. This officer has the authority to halt work if any safety hazards are detected, and must remain on site until the work is completed. 5. Before construction, place all the tools required for disassembly at the designated location for disassembly, and check their safety. Construction safety measures: 1. If safety hazards are detected at a work site during construction, work must be stopped immediately, reliable measures must be taken, and the matter must be reported to the relevant supervisors. Work can resume only after those safety hazards have been completely eliminated. 2. During construction, workers must follow the instructions of the construction supervisor and eliminate all potential hazards before entering the work area. 3. Before commencement of work, the person in charge of the construction must go through the procedures to cut off power supply. This person shall assign a dedicated electrician to handle the turning on and off of power. Before removing the feeders, starters, motors, cables, and all electrical equipment, it is necessary to disconnect the power from the higher-level source, and a warning sign stating “Power Supply Strictly Prohibited” must be placed there to prevent accidental re-activation of power. A dedicated person should be assigned to monitor this disconnected power source. Once the electrical equipment has been removed, the person in charge of the construction shall lift the safety measures. 4. The switching on and off of electrical equipment must be carried out by designated personnel, in strict accordance with the relevant provisions outlined in the \"Procedures for Switching on and Off Power\", the \"Coal Mine Safety Regulations\", and the \"Operating Procedures for Special Types of Equipment\". 5. All special personnel must receive professional training and work with valid certificates. 6. Before carrying out any demolition work, it is necessary to inspect everything within the relevant area, remove all loose objects and debris, etc., to ensure that safety passages remain unobstructed. Unauthorized personnel are strictly prohibited from entering the construction site. 7. It is strictly prohibited to damage or deform the equipment during the recycling process. 8. Safety measures for electrooxidation: When carrying out electrooxidation operations, the following measures must be followed: (1) The person in charge of the project must fill out the approval form for the electrooxidation operation; work can only begin after it has been reviewed by all relevant supervisors, the necessary personnel are present at the site, and the safety facilities are in place. This measure is attached to the joint review form. (2) Before construction, a dedicated gas inspector assigned by the Ventilation Department will accompany the work throughout the process. (3) Full-time gas inspectors are responsible for monitoring gas levels before construction and throughout the entire construction process. Electric oxygen welding can only be carried out when the gas concentration within 20 meters of each construction site is below 0.5% and there is no local accumulation of gas. (4) Before construction, the workers are responsible for thoroughly removing flammable materials and debris within 20 meters of the construction site. (5) The construction supervisor is responsible for providing at least 2 qualified fire extinguishers at the construction site, laying water pipes to the work area as close as possible, and providing other fire-fighting equipment such as fire buckets. (6) Thoroughly inspect the equipment to be used during construction before starting work, to ensure it is in good condition. (7) On-site workers must possess knowledge of fire safety and be able to use fire extinguishing equipment skillfully. (8) Personnel performing electro-oxidative welding must receive professional training and work with valid certificates. (9) Before construction, a thorough inspection of the area within 50 meters in front of and behind the construction site should be carried out to remove all floating objects, debris, etc., in order to ensure safety during work. Unrelated personnel are strictly prohibited from entering the construction site. (10) The wiring and disconnecting of welding machines must be carried out by qualified electricians. The casing of the welding machine and the workpieces to be welded must be grounded, while the cables and welding handles must have good insulation. The welding ground wire must not be connected to steel wires, pipelines, belt conveyors, tracks, etc.; a dedicated cable must be used for this purpose. (11) Before starting the work, flammable materials such as coal dust and wood shavings at the work site must be removed to prevent fires. During the work, one person should be assigned to sprinkle water on the areas where slag falls, to ensure that the slag is extinguished promptly. (12) Within a 10-m radius around the construction site, nearby cables, pipelines, and other equipment and facilities must be effectively protected using non-combustible materials, as appropriate; furthermore, non-combustible materials should be used beneath the construction site to catch any sparks. (13) Immediately after completion of construction, withdraw equipment such as welding machines, oxygen, and acetylene to the designated location on the ground. (14) During construction, if the gas concentration within 20 meters of the work area reaches 0.5%, construction must be stopped immediately. The cause must be identified and addressed, and work can resume only after safety is confirmed. (15) Construction workers should promptly extinguish the sparks and embers generated during welding to prevent accidents resulting therefrom. (16) During operations, flammable materials such as coal dust and wood shavings at the work site must be removed to prevent fires. (17) During construction, effective protection should be provided for nearby equipment as appropriate. (18) After the work is completed, spray the construction area with water again and leave someone on site for at least 60 minutes as a supervisor; only after confirming everything is in order can the person leave the site and report to the dispatcher. 9. Before removing the bolts from the MG200/610 coal mining machine, the relevant power supply equipment must be powered off, and a dedicated person should be assigned to monitor it. The site security measures can be lifted only by the project supervisor after the work is completed. 10. All personnel must wear safety helmets with their straps fastened, as well as rubber boots. Those working at heights must find a secure point to attach the safety rope and fasten their safety belts. 11. Operations not mentioned shall be carried out in strict accordance with the relevant provisions in the Coal Mine Safety Regulations. 12. The safety officer is fully responsible for overseeing the entire project throughout its duration, being present on site to direct construction activities and ensure that all relevant regulations are followed. Other safety measures: 1. Before carrying out lifting operations, it is necessary to carefully inspect the lifting equipment required for the task; the load capacity of such equipment should be appropriate. If the load exceeds the permissible limit, suitable lifting equipment must be used or the object must be broken down into smaller parts, and only then can the lifting operation proceed once all requirements are met. 2. When lifting an object, it must be securely tied down, and the stress conditions in all areas should be carefully checked; lifting may proceed only when everything is in order. If the object has sharp corners or a smooth surface, an anti-slip layer should be applied at those corners or on the smooth areas. 3. The chain of a hand chain hoist must not be used if its wear exceeds 5% of the original diameter. When pulling the zipper, apply even force with both hands; do not pull too hard or too quickly. When the lifted object needs to be suspended in the air, attach the zipper to the main chain to prevent it from slipping. 4. Under no circumstances shall human weight be used to balance the load being lifted; one must not stand on the load while lifting it, and it is strictly prohibited to use hands to adjust the lifting equipment or other devices that hold the load in place. 5. When carrying out lifting operations, it must be under the unified command of the construction supervisor; the workers must concentrate fully, and playing around is strictly prohibited. Unqualified lifting equipment must not be used. 6. When disassembling the belt conveyor, proceed step by step in accordance with the established procedures; it is strictly prohibited to carry out operations simultaneously from above and below. 7. It is strictly prohibited to work while under the influence of alcohol, and it is also strictly prohibited to work when tired. 8. Every person who participates in the task should understand in advance the task details, the work content, the planned procedures, as well as the safety measures and relevant regulations related to the task. Construction plan and demolition sequence: 1. Clear the silt, loose coal, and gangue from the roadways along the xxxx belt. 2. Remove accessories such as coal baffles, coal sweepers, and coal chutes to facilitate the removal of the belt conveyor. 3. Remove various belt centralized control protection systems, and sort them out for orderly storage. 4. Cut off the power supply to the belt conveyor main switch KBZ-400, the soft starter, and the flame-retardant mining cables, then sort them out and store them neatly. 5. Before loosening the conveyor belt, secure the bottom conveyor belt using a chain block to prevent it from sliding. 6. Set the tension winch starter to the reverse direction (release) to protrude the conveyor belt. 7. Remove the tension winch and coil its wire rope neatly for easy removal from the well. 8. Loosen the conveyor belt joints, and manually pull the upper section of the conveyor belt into the drift, rolling it up and placing it in a wider area of the drift to facilitate its removal from the mine by the material handling team. 9. Remove the three rollers, straight rollers, H-frames, crossbeams, and related accessories of the belt conveyor, and transport them to the designated location in a timely manner. 10. Remove the head unloading drum: (1) Drive the lifting anchor bolts, then use two 5T chain hoists to lift the unloading drum; after removing the fixing screws, lower the drum to a safe area. (2) Remove the head support and the roller bracket used for unloading; adhere to the principle of removing anything that can be taken apart. Disassemble the brackets and large components into smaller parts before loading them onto a vehicle for transport. 11. Remove the head frame and drive drum: (1) Remove the protective mesh and side frames of the head frame one by one and transport them to the designated location. (2) Remove the redirection roller and drag roller. (3) Separate Drive Drum 1# and Drive Drum 2#, so as to disconnect the reducer from the drive drum connection device. (4) Remove the screws securing the drive drum, lay sleepers at the bottom, and use a 5T chain block to move the drive drum to the designated position. (5) After removing the side frame of the headstock and the tensioning device, use a chain block to move all components such as the motor, reducer, and base to the delivery location.