【Ten Years of Rapid Development in Chemical Engineering Equipment】The tallest jacket among the offshore oil and gas production platforms in the Hainan Sea area, 2236-2025, has been completed

2025-03-07View Original

Thread Content

Give praise and encouragement to the achievements made in China’s chemical engineering technology and equipment; your participation in discussions is the greatest encouragement. **********************【Ten Years of Great Development in Chemical Engineering Equipment】Regular updates and summaries are available; feel free to join the discussions: https://bbs.hcbbs.com/thread-3576046-1-1.html ***************** On March 3, the new onshore platform for the Wen Chang 16-2 oil field development project was completed at the Zhuhai Deep-Water Equipment Manufacturing Base. This marks a significant progress in the project’s construction, laying a solid foundation for its timely commissioning. The Wen Chang 16-2 oil field development project is located in the western part of the Pearl River Delta basin, about 200 kilometers away from Wen Chang City in Hainan Province. The water depth in the operation area is around 150 meters. The project involves the construction of a jacketed platform. The length of the underwater pipelines and cables used for transporting oil and gas from the Wen Chang 16-2 WHPA platform exceeds 28 kilometers. This platform is capable of carrying out oil and gas extraction, providing living conditions for personnel, and facilitating offshore drilling and completion operations. As for the platform’s structure, it features a four-leg, twelve-pile jacket design, with a total height of over 160 meters. It is currently the tallest jacketed platform among those used for offshore oil and gas production in the area surrounding Hainan Island. The upper part of the platform consists of four decks, equipped with more than 60 sets of production equipment. Its length is 65 meters, its width is 49 meters, and its projected area is equivalent to that of 7.5 standard basketball courts. The living quarters are designed according to industry standards, using a shell-and-plate structure, and can accommodate 80 workers for long-term residence at sea. The modular drilling rig includes 20 drill slots and various types of automated equipment; its design lifespan is 25 years, sufficient to meet the basic needs of oil field development. The platform consists of four components: the jacket, the upper structure, the living quarters, and the modular drilling rig. Its total height exceeds 200 meters, and its total weight is around 19,200 tons, which is roughly equivalent to the combined weight of 13,000 cars
Reply #22025-03-07
【Ten Years of Rapid Development in Chemical Engineering Equipment】Completion of the jacket for China’s most complex international offshore oil and gas project between 2025 and 2035 https://bbs.hcbbs.com/thread-5681373-1-1.html (Source: Haichuan Chemical Engineering Forum)
Reply #32025-03-07
【Ten Years of Rapid Development in Chemical Processing Equipment】The 16,300-ton central platform CEBP module for the Caofeidian 6-4 oil field was manufactured between 2022 and 2025. https://bbs.hcbbs.com/thread-5681372-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #42025-03-07
【Ten Years of Rapid Development in Chemical Processing Equipment】The World’s Largest Diesel Adsorption and Separation Units, 2023–2025 – CCCC https://bbs.hcbbs.com/thread-5681371-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #52025-03-07
【Ten Years of Rapid Development in Chemical Processing Equipment】Completion of the upper modules for super-large 400,000-ton “offshore oil and gas plants” from 2022 to 2025 https://bbs.hcbbs.com/thread-5681370-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #62025-03-09
【Ten Years of Rapid Development in Chemical Engineering Equipment】2238-2025: The world’s first application of molten salt energy storage technology in oil field steam injection applications https://bbs.hcbbs.com/thread-5681448-1-1.html (Source: Haichuan Chemical Industry Forum)

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.