HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

The vinyl glass flake resin lining in the desulfurization tower began to peel off after 2 years of use; how can it be repaired?

2024-11-11View Original

Thread Content

The image below shows that the inner wall of a desulfurization tower at a petrochemical company, which was lined with vinyl glass flake resin (4mm thick), experienced delamination after 2 years of use in that tower. What methods can be used for repair?
Reply #22024-11-11
For the repair of a detached vinyl glass flake resin lining, the following steps are recommended: 1. Clean the detached area: First, it is necessary to completely remove the detached resin and any loose material. Use a high-pressure water gun or appropriate mechanical equipment to clean the affected area, ensuring that there are no debris or dust left. 2. Surface treatment: The exposed metal surface is polished or sandblasted to increase its roughness, which helps improve the adhesion of the new coating to the substrate. 3. Primer application: Apply a suitable layer of primer to enhance the adhesion of the resin and ensure optimal repair results. 4. Apply resin topcoat: Use a vinyl glass flake resin of the same type or compatible with the original one; after mixing it in the recommended proportions, apply it evenly to the treated area. Multiple applications may be required to achieve the original thickness. 5. Curing and inspection: Cure the resin for the duration specified in its instructions, then conduct a thorough inspection to ensure that there are no significant height differences between the repaired area and the surrounding old coating, and that the repair is firmly attached. 6. Regular monitoring: After the repair is completed, the desulfurization tower should be inspected regularly to monitor the condition of the lining, and maintenance records should be kept. If new abnormalities are detected, they should be addressed promptly. To ensure compliance with safety standards during the operation, it may be necessary to have professionals carry out the aforementioned tasks. .

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.