HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Basis for formulating corrosion inspection plans for petrochemical production units

2025-11-10View Original

Thread Content

Based on the actual conditions of the plant (process flow, process parameters, equipment characteristics) and the results of the RBI risk assessment, the corrosive agents acting on different parts of the plant are identified; as well as the possible corrosion mechanisms, the failure modes associated with these mechanisms, and the detection methods for them. Thereby determining the focus of the corrosion investigation and the inspection strategy.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.