The bending moment on the external connection flange is too large, and the flange fails the verification.

2017-02-22View Original

Thread Content

This post was last edited by jinqhuaxz on 2017-2-22 at 12:04. The bending moment experienced by the external connection flange is too high, resulting in failure in the flange verification. Are there any good solutions?
Reply #22017-02-22
External pipelines are required to have flexible connections in order to reduce bending moments.
Reply #32017-02-28
Modify the bracket constraints of the nearby pipelines, or adjust their routing to increase flexibility.
Reply #42017-08-06
SolidWorks, do you think it’s suitable, OP?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.