Thread Content
This post was last edited by 18663069001 on 2017-9-8 at 16:58. To help everyone learn more about Aspen Plus, a \"One Question per Day\" activity is launched; replies will reveal the questions. To encourage ongoing participation from everyone! You get 3 wealth rewards just for participating! Points will be given to those who answer correctly! I hope everyone will engage in in-depth discussions and learn together! True or False: 47. Moving the connection of a logistics item: Without changing the existing connections of the logistics items to the ports on the icon, move a logistics item to the point where it is connected to a unit operation module: 1. Click on the logistics item you want to move, or click on the module it is connected to. Logistics has been selected. 2. Point the mouse pointer at the logistics end connected to the module. The arrow is highlighted and a text box displaying the port content appears. 3. Click the left mouse button. The mouse pointer changes to a moving shape. 4. Drag the logistics endpoint to the preferred point on the module and then release the mouse button. The mobile logistics endpoint is not the connected logistics endpoint that is mobile. Therefore, the points at the end of the logistics attached to the module are not ports and cannot be used directly to connect more logistics. 5. To display the location of a port, click on the end of the logistics route. Tip: You can also move any part of the logistics route by selecting it and dragging it to the new position you desire. The answer to this question is: Yes