HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

There are warnings in the ASPEN simulation process flow – is the result still reliable?

2018-10-17View Original

Thread Content

In the process with loops, errors occurred during the first few iterations, but the final result still converged. Is the result reliable?
Reply #22018-10-19
It indicates a cross-over in the heater temperatures, and the selection of utility systems is inappropriate; however, the results are still reliable. The heaters were modified to improve their appearance.
Reply #32018-10-19
A warning is not an error; the result is reliable.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.