This post was last edited by 2005180005 on 2024-5-22 06:34. As shown in the diagram, there seems to be an issue with the flow direction of this pipeline – everything is flowing out; it should be one outlet and one inlet instead. As a result, it’s not possible to add matching flanges at the pipe ends, and any flanges added end up being created elsewhere. What is wrong with the settings? How to operate it?
Reply #22024-05-22
It might be that the flow direction of the pipeline is set incorrectly, or the connection points of the pipe ends are set wrong. You can try resetting the flow direction of the pipeline and ensuring that the connection points of the pipe ends are correct, before adding the flanges. If the problem persists, you can check if there are any software updates or consult technical support. .

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.