HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

The 220KV main transformer for the industrial gas island project in the first phase of Guangxi Huayi Qinzhou Chemical New Materials Integration Base has been successfully powered up

2020-08-11View Original

Thread Content

The 220KV main transformer for the industrial gas island project in Phase 1 of the Guangxi Huayi Qinzhou Chemical New Materials Integration Base was successfully powered up. Author/Source: HuaHuaNet Coal Chemicals. Date: 2020-08-09. Clicks: 16. At 23:53 on August 6, the 220KV main transformer for the industrial gas island project in Phase 1 of the Guangxi Huayi Qinzhou Chemical New Materials Integration Base was successfully powered up. The 220kV main substation for the industrial gas island project is a two-story steel-concrete framed building covering an area of 2,042 square meters with a construction area of 3,132 square meters. It is equipped with 2 150 MVA oil-immersed transformers, operating at a voltage level of 220/35kV. There are 2 220kV output lines, which are connected to the 220kV Gangkou Substation and the 220kV Yajiang Substation respectively ; 18 35kV outgoing circuits. http://img.yf116.cn/image/img/20200809/2216578021759.jpg The Huayi Qinzhou Chemical New Materials Integrated Base is located in the Qinzhou Petrochemical Industrial Park and covers an area of approximately 8,000 mu. It will be developed in three phases. The first phase involves the industrial gas island project, with a total investment of 14.3 billion yuan; this project focuses on the coal chemical industry chain. Construction began in November 2017, and it produces industrial gases such as hydrogen, syngas, and nitrogen for use by enterprises within the park, as well as chemical products like methanol, ethylene glycol, and acetic acid. Completion and operation of this phase are expected by 2020. The second phase of the light hydrocarbon comprehensive utilization project has a total investment of around 20.8 billion yuan. The project focuses on ethane cracking and propane dehydrogenation as its core processes, and it will produce products such as polyethylene, ethylene glycol, ethylene-vinyl acetate copolymer (EVA), acrylics and their esters, polyether polyols, caustic soda, and polyvinyl chloride. Construction is expected to begin in 2019. The main plant area of the project is located in plots 25 and 26 in the Qinzhou Petrochemical Industrial Park, to the south of it.
Reply #22020-08-12
Foam_ZPTK posted on 2020-8-11 20:09. Thank you for sharing; you’re welcome

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.