Is there a time limit required before moving to industrial production once the pilot project of the first set of equipment is operating stably?

2021-05-19View Original

Thread Content

The last edit to this post was made by qy576100527 on 2021-5-19 at 16:19. Is there any time limit regarding when industrial production can begin after the pilot project of the first set of equipment operates stably?
Reply #22021-05-19
There shouldn’t be any requirements for this, because even if the pilot phase is completed, scaling up for industrial use might not necessarily be easy
Reply #32021-05-19
No. As long as the scaled-up process package can be developed, the engineering design for the scaled-up industrial plant can be carried out directly.
Reply #42021-05-20
No, but an expert safety assessment is required for pilot testing.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.